AS9102 FORMS PDF

AS/EN/SJAC Rev B First Article Inspection Form 1: Part Number Accountability. Sheet of. Form 1. A, B, C, D. 1, 1. Part Number: 2. Part Name: 3. AS/EN/SJAC Rev A First Article Inspection Sheet 1 of _. Form 1: Part Number Accountability Form 1, Rev A, Date: Oct 31, This SAE Aerospace Standard (AS) establishes documentation requirements for the First Article Inspection (FAI).The purpose of the First Article Inspection is to.

Author: Vutaxe Kigak
Country: Finland
Language: English (Spanish)
Genre: Love
Published (Last): 12 January 2009
Pages: 141
PDF File Size: 11.39 Mb
ePub File Size: 13.2 Mb
ISBN: 122-6-93303-673-2
Downloads: 90948
Price: Free* [*Free Regsitration Required]
Uploader: Dujinn

The AS document consolidates a series of forms to help ensure consistency across the board in aerospace technology and other engineering fields.

What is AS? | Usable Forms 1, 2, 3 – Definitions and Requirements

This form lists all the characteristics of the part, including characteristic requirements and corresponding inspection results. Filling out and tracking these forms help companies ensure validity and reliability when introducing new parts. Importance of AS The AS document consolidates a series of forms to help ensure consistency across the board in aerospace technology and other engineering fields.

  JHMI SHUTTLE PDF

This form helps an engineer validate the new process and demonstrates how this new process will be used along side existing methods. The three AS forms are: This new revision was meant to consolidate multiple requirement forms as well as improve the process and organization of these forms.

Requirements for AS With all the specifications listed in the AS revision, and all the different fields that this form covers, it might seem difficult to understand which sections of the form must one complete before submitting it. There are several advantages to companies adhering to this new standard. The part number accountability ass9102 designates specific names, serial numbers, and FAI report numbers for parts used in both the design and manufacturing fogms.

Examples of optional information include the name of the person who prepared the FAI, the name of the person who approved the FAI, the date FAI is reported, and firms name of the customer who approved everything. These measures help guarantee repeatability of the production of these products.

  BRUNO BETTELHEIM EL PSICOANLISIS DE LOS CUENTOS DE HADAS PDF

Some fields that might be considered conditionally required include drawing number, additional changes, and designing tool. Next, product accountability includes citation of raw material specifications, special processes, and functional testing.

Get FREE AS Forms for FAI | DISCUS Software

With all the specifications listed in the AS revision, and all the different fields that this form covers, it might seem difficult to understand which sections of the form must one complete before submitting it. Finally, as102 accountability evaluates verification and compatibility. If something goes wrong in the process, the company can look back at the documentation to see exactly which part he needs to change.